Claremont prices
Tile and slate prices in Claremont, CA
Tile pricing has two parts that get confused: the tile itself, which lasts decades, and the underlayment beneath it, which does not.
Be first in line
No company gets your details until you say yes to it by name.
You are on the list.
No provider in Claremont is taking requests through this service yet. We are lining them up, and yours is kept until one can.
- Nobody gets your details yet. Your request stays with us and is not passed to any company.
- One email when someone can help. When a provider covering your area can take it on, we email you once and ask whether you want that company, by name, to contact you.
- Deleted after 90 days. If nobody can take it on, or you do not say yes, your contact details are deleted 90 days after your request.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
Nobody will call you about this request unless you say yes to a company by name.
These are estimated ranges, not quotes. Compiled from public installed-cost data for California and adjusted for how Claremont is built. No contractor is bound by them, and nobody can price a roof they have not stood on.
| Covering | Per square | Typical whole roof | Expected life |
|---|---|---|---|
| Architectural asphalt shingleThe default choice on most American homes, and usually the right one. | $650 – $950 | $13,000 – $27,500 | 25 to 30 years |
| Concrete tileThe tile lasts far longer than the underlayment beneath it, which is the catch. | $1,200 – $2,000 | $24,000 – $58,000 | 40 to 60 years |
| Clay barrel tileOften salvaged and re-laid over new underlayment rather than replaced. | $1,700 – $3,200 | $34,000 – $93,000 | 50 to 80 years |
What moves the price
- How much decking turns out to be soft once the covering is stripped
- Warranty tier, which is really a question about who honours it in fifteen years
- The number of penetrations: chimneys, skylights, vents, solar mounts
- How many old layers have to come off before the new one goes on
- Permit and inspection fees, which vary more between towns than people expect
Locally
The south and west slopes fail first and fail visibly. Everything else follows some years later.
Ask specifically whether the quote is for new tile or for relaying the existing tile. The difference is enormous and easy to miss.
These are estimates, not quotes. They are compiled from national installed ranges adjusted for California costs and for how Claremont is built. No contractor is bound by them.
Questions about price
Should I take the cheapest quote?
Not automatically. Put the quotes side by side on layers, not on totals — underlayment, ice-and-water, drip edge, valley treatment, ventilation, decking allowance, warranty. Cheap usually means less of those, not the same roof for less money.
How long does a re-roof take?
Two days is typical for asphalt. Add days for steep pitch, multiple layers to strip, tile work, or a roof with a lot of valleys and penetrations.
Do you handle commercial buildings?
Yes. Commercial requests go to contractors who do low-slope and flat systems rather than to residential crews. Say so on the property question and it routes correctly.
What is it going to cost?
Free, no obligation, and your details go to no company until you say yes.